*
*
*
*
The construction permissions documents have been altered, and so have the building's disseminating.
1. Copy the display documents. Owns the building.
Two books representing the owner of the building.
Three books show whether it's manager or representative. (In case the legal permissions are allowed)
Four-pointed plans, plans and a series of plans.
5. One series of calculations. (In case of public buildings, special buildings, or permanent objects and most of the fire-resistant objects)
6.1 count of building-stression scale. (In case of public buildings, special buildings, or permanent objects and most of the fire-resistant objects)
7. The warrant for the design of buildings or the design and the calculating of buildings and the copy of licenses, the licenses, the engineering and engineering professions. (In case the building looks or size is in the architecture class, control or engineering, legally controlled by that, in the case of,
Eight-book consenting to the operator and copy of the license as a license to do a management or engineering career. (For instance, the building is said to be in that case, but the case and purpose is to present it with this permission.)
Nine certificates were allowed to be a master architect, a control architecture or a engineering expert, released by architects or an engineer council in the case of the engineer.
10th, L.A. 3rd, then.
11. The book of consent of land owners in case of building buildings in other people's land.
12. Other documents. (If there is)
Please complete the document below for discussion: